Check sewer and property records
Confirm the parcel, existing approvals and public sewer availability. New Hanover requests provider documentation that sewer or water is unavailable where applicable.
Match the design to the site
Evaluate soil layers, seasonal wetness, slope, setbacks and usable space. The tank stores and settles waste; the field needs its own design.
Prepare for the soil evaluation
Submit a site plan, identify boundaries and easements, clear safe access, and mark proposed structures. Keep the primary and repair areas undisturbed.
Obtain the construction approval
The Improvement Permit identifies an acceptable site and system concept. Construction Authorization supplies the installation design and must be secured before work.
Inspect before cover up and use
Coordinate county inspections before burying components. Complete the required approval and Operation Permit before using the system.